Tolong JANGAN LUPA buat DATA DIRI, PHOTO, NOMOR INDUK MAHASISWA DAN JUGA KELAS BERAPA DIDALAM SETIAP BLOGGER MASING-MASING.
Desktop Wallpapers
Beautiful land
beautiful dreaming
Kamis, 20 November 2008
A filed Trip with MAPINFO Professional
Sabtu, 08 November 2008
Open the new window yaaaa
MIS
Problems posed by the new IT infrastucture include loss of management control over systems, the need to carefully manage organizational change connectivity and application intregration challenges, the difficulty of ensuring network scalability. realiability, and security and also controlling the hidden costs of enterprise computing.
Solutions include planning for and managing the bussines and organizational change assosiated with enterprise, wide computing, increasing end users training, asserting data administration disciplines, and considering connectivity, application, intreagation. and also bandwith when planning the IT infrastructure
Diana
MIS is very important........
Contoh case study yang saya berikan pada waktu presentasi adalah bagaimana telecommunication and network menjadi satu infrastructure di oil company Sclumberger dan juga menjadi metode penyelesaian traffic dan bagaimana university di Sidney mengaplikasikan telecommunication and network.
Dalam suatu pekerjaan ini dapat menjadi salah satu aksesbility yang ampuh untuk penyelesaian proyek dan pekerjaan.
Kenneth C Laudon dan J, P laudon dalam Bukunya " MIS " menceritakan aplikasinya, dan bagimana ini menjadi suatu part yang penting di suatu company.Adapun kelemahan buku Laudon ini dalam pandangan saya, tidak diberikan contoh detail dalam penggunaan aplikasi MIS di suatu company.
Dan di buku ini hanya diberikan gambaran umum saja (contoh halaman 531 )...........How the problem before using MIS and after using MIS...
Kamis, 06 November 2008
Presentasi PAKPERWIRA
http://www.ziddu.com/download/2599654/PRESENTASIPAKPERWIRA16SEPT2008.ppt.html
China Yangtze Three Gorges Project (TGP) introduction

TGP is a multi-objective development project with great benefits in flood control, power generation, and navigation and so on. The project consists of river dam, spillway structures, powerhouse, buildings for navigation, etc, and organized by the scheme officially briefed as ¡°developed in one scale, completed in one time, water-storage by
stages, and continuous mgiration¡±. The dam is concrete gravity dam , with the spillway in the middle, and the power house and non-overflow section at both sides . The axial length of the dam is 2309.47m, the crest height is 185m, and the maximum height of the dam is 181m. With a normal storage level at 175m, the total capacity of the reservoir reaches 39.3 billion m 3 , of which the effective flood control capacity reaches 22.15 billion m 3 .
The total period of TGP construction is 17 years, which can be divided into three phases. Phase I (1993~1997) was designed mainly to do advance work for project construction and excavation of diversion channel with the river close-off as the milestone. Phase II (1998-2003) was mainly designed for construction of spillway and left-bank power house and the ship lock, with the completion of initial water storage, commercial operation of first batch of generators and ship lock open to navigation as several significant milestones of this phase. Phase III (2004-2009) has the main task of construction of right-bank dam and powerhouse, which is symbolized as the commercial operation of all the generator units and completion of the project.